Skip to content
ERPDocs

SignPack Statuses Explained

Every SignPack has a status that reflects where it is in the signing lifecycle. Here's what each status means and what actions are available.


SignPack Statuses

Status Color Meaning
Draft Gray The SignPack is being created or has been recalled. You can edit documents, recipients, and fields.
Sent Blue Signing invitations have been emailed to recipients. No one has signed yet.
In Progress Yellow At least one recipient has viewed or signed, but not all have completed.
Completed Green All recipients have signed. Signed documents have been delivered.
Declined Red A recipient has declined to sign.
Correction Requested Orange A signer has requested corrections to the document.
Recalled Purple The SignPack owner has recalled it for editing. Signatures have been cleared and old signing links no longer work. Editable and re-sendable.
Cancelled Gray The SignPack has been voided. Signing is over: recipients lose access and any unredeemed embedded handoff sessions expire immediately. Signatures already collected are not cleared.
Expired Gray The signing deadline passed before all recipients completed.

Status Flow Diagram

                    ┌──────────┐
                    │  Draft   │
                    └────┬─────┘
                         │ Send
                         ▼
                    ┌──────────┐
              ┌─────│   Sent   │─────┐
              │     └────┬─────┘     │
              │          │ View/Sign │
              │          ▼           │
              │     ┌──────────┐    │
              │     │In Progress│    │
              │     └──┬───┬───┘    │
              │        │   │        │
         ┌────┴────┐   │   │   ┌───┴────┐
         │Declined │   │   │   │Expired │
         └─────────┘   │   │   └────────┘
                       │   │
              ┌────────┘   └────────┐
              ▼                     ▼
    ┌─────────────────┐     ┌───────────┐
    │   Completed     │     │Correction │
    └─────────────────┘     │ Requested │
                            └─────┬─────┘
                                  │ Recall
                                  ▼
                            ┌──────────┐
                            │  Draft   │ (cycle restarts)
                            └──────────┘

Available Actions by Status

Draft

  • Edit SignPack title, message, and expiration
  • Add/remove documents
  • Add/remove/reorder recipients
  • Place and edit fields in the Field Editor
  • Upload a revised document (after recall)
  • Send the SignPack

Sent

  • View recipient list and sending details
  • Send reminders to recipients
  • Recall the SignPack
  • View audit trail

In Progress

  • Track which recipients have viewed/signed
  • Send reminders to unsigned recipients
  • Recall the SignPack
  • View audit trail

Completed

  • Download the merged, PAdES-sealed signed PDF (sealed once at completion and cached in cloud storage)
  • Download the Certificate of Completion (details)
  • View the full audit trail (view, verify, sign, decline, correction, completion events)
  • View all recipient actions, timestamps, IPs, and authentication methods
  • Clone the envelope via the More menu to send a fresh copy with the same documents, recipients, and field layout

Expiration note: Completion is a terminal state. Signed recipients can continue to re-open their signing link and download the signed PDF / certificate even after the original expires_at date has passed (subject to identity re-verification). The pending-invitation link expires; the completed record does not.

Declined

  • View the decline reason provided by the recipient
  • Recall the SignPack to make changes and resend
  • View audit trail

Correction Requested

  • View correction comments from signers
  • Reply to correction comments
  • Resume Signing — resend to signers without changes
  • Recall — pull back for editing
  • View audit trail

Expired / Cancelled

  • Recall — reopen the envelope for editing (it moves to Recalled), then resend with a new deadline
  • Clone — create a fresh envelope from the expired or cancelled one
  • View audit trail

Only pending invitations are affected by expiry. If any recipient had already signed before the expiry date, their signed record is preserved and viewable; if all required signers completed, the envelope is Completed, not Expired.

Recalled

  • Everything available in Draft — the envelope is editable and can be sent again
  • Void — cancel it outright instead of resending (see below)
  • View audit trail

Void vs Recall

Both stop an envelope that is out for signature, and they are not interchangeable.

Void Recall
Resulting status Cancelled Recalled
Signatures already collected Kept as-is Cleared on every recipient
Signing links Stop working Invalidated and regenerated on the next send
Embedded handoff sessions Unredeemed sessions expire immediately Invalidated with the old tokens
Recipients notified Best-effort cancellation email to non-embedded recipients No automatic email
Intent The agreement is off The agreement needs fixing and resending
Available from Sent, In Progress, Correction Requested, Recalled Any status except Draft, Recalled, Completed and Imported

A Cancelled envelope is a terminal outcome, but it is not a locked record: you can still Recall it to reopen it for editing and send it again. Doing so clears the signatures collected before the void, exactly as recalling any other envelope does. If you want to keep the voided record intact, Clone it instead and send the copy.

Voiding is available through the API (POST /api/v1/signpacks/{id}/void) — see Voiding a SignPack. Recall is a UI action; there is no recall endpoint.


Recipient Statuses

Individual recipients also have statuses:

Recipient Status Meaning
Pending Invitation not yet sent (waiting for their turn in sequential signing)
Sent Invitation email delivered
Viewed Recipient opened the signing link
Signed Recipient completed signing (or reviewing, for Approvers)
Declined Recipient declined to sign

Next Steps